Bridges
Bridges

Building bridges can be considered as one of the oldest innovative ideas for Effective communication.. With advancement of technologies, their utility and scope have also grown.
KMC has been in forefront in designing and constructing major and minor bridges. Several major bridges constructed by KMC stand as the most useful landmarks. The high bridge across river Pennar in Andhra Pradesh or the high level bridge across river Pulikalva near Gunapatipalem are some of successful examples to read about.
KMC has undertaken construction of some of the largest and most complex bridges in India and has to its credit masterful achievements completed well within the time parameters set, and many before their scheduled time of the completion itself. This star attribute has resulted in KMC being the most sought after company for undertaking of mega bridge building projects across the length and breadth of our country.
The engineering expertise that we have demonstrated in our bridge projects is standing testimony to the technical and architectural prowess that we proudly carry forward helping us to envelop more challenging assignments in the sector.
The engineering expertise that we have demonstrated in our bridge projects is standing testimony to the technical and architectural prowess that we proudly carry forward helping us to envelop more challenging assignments in the sector.
Major Bridges
Construction of Major Bridge across river Parvathi, of Rehabilitation and Upgrading of Km 449.150 to Km 509.000 of NH-76 to 4-lane Con_guration in the State of Rajasthan, Contract Package EW-II (RJ-10). Length of the bridge 806.22 m (18 Spans of 44.72 m c/c) having superstructure of PSC Girder Slab (8273.185 Sqm), substructure of RCC Piers & Abutments and open Foundations for Piers & Pile foundations.- Construction of ROB, in Rehabilitation and Upgrading of Km 449.150 to Km 509.000 of NH-76 to 4-lane Configuration in the State of Rajasthan, Contract Package EW-II (RJ-10). Length of the bridge 73.20 m (3 Spans of 24 m c/c) having super structure of PSC Girder Slab , sub structure of RCC rectangular Piers & Abutments and open foundations.
- Renigunta – Guntakal Section: Rebuilding of double line bridge No. 393 across river Cheyyar (1 x 39.60 m +23 x 40.20 m + 1 x 39.60m) with PSC spans on open/Well foundations at Km 218/1-15, on permanent diversion,including earthwork in approaches from Ch. 900 m to Ch. 2400 m construction of Minor bridge no.392 (1 x 3.66m RCC Box) between hastavaram and Nandalur stations. Length of the bridge 1003.80 m (2 x 39.60 + 23 x 40.20m) having super structure of PSC Girder Slab , sub structure of RCC Piers & Abutments and well foundations.
- Construction of Major Bridge across river Cheyyeru at Km 44.424 m of Cuddapah – Renigunta Road . Length of the bridge 806.22 (18 Spans of 44.72 m c/c) having super structure of PSC Girder Slab , sub structure of RCC Piers & Abutments and well foundations.
- Construction of Major Bridge across river Birupa, a Branch of River Mahanadi of Jagatpur – Chandikhole Road on NH-5. Length of the bridge 1008.60 m (41 x 24.60 m) having super structure of RCC T-beam with Deck Slab , sub structure of RCC Piers & Abutments and well foundations.
- Construction of Major Bridge over river Vakkileru at ch. 185+668 in contract package for 4 laning of Cuddappah – Kurnool of NH-18. Length of the bridge 87 m (3 spans x 29m) with open foundation.
- Construction of Major Bridge over river Bavanasi at ch. 229+593 in contract package for 4 laning of Cuddappah – Kurnool of NH-18. Length of the bridge 104m (4 spans x 26m) with open foundation.
- Construction of Major Bridge over river Vakkileru at ch. 236+360. Length of the bridge 168m (7 spans x 24m) with open foundation.
- Construction of Major Bridge over river Kundu in the state of Andhra Pradesh (contract for 4 laning of Cuddappah – Kurnool of NH-18) having a 312m length (12 spans x 26m) Grade Separator near Kurnool (Cuddappah – Kurnool / NH-18)of 80m (2 spans x 25 m and 2 spans x 15m) open foundation.
- Construction of Major Bridge under EPC contract for Six Laning of Gurgoan – Kotputli – Jaipur Section of NH-8 from stretches km 42.70 to Km 73.00, km 107.10 to Km 144.77 and km 181.30 to Km 219.50 in the State of Haryana and Rajasthan to be executed as BOT (Toll) on DBFO Pattern under NHDP Phase – V. Length of the bridge 200m at ch. 192+575 ( 9 spans x 21m) with Pile Foundation.
- Construction of Major Bridge under EPC contract for Six Laning of Gurgoan – Kotputli – Jaipur Section of NH-8. Length of the bridge 102m at ch. 195+329 (10 spans x 10.15m) Open Foundation.
- Construction of Major over under EPC contract for Six Laning of Gurgoan – Kotputli – Jaipur Section of NH-8. Length of the yover 217m at ch. 201+120 (10 spans x 10.15m) Pile Foundation.
- Constructions of Six yovers under EPC contract for Six Laning of Gurgoan – Kotputly – Jaipur Section of NH-8 each having single span of varied meters from 11m upto 31m. Open foundation.
- Construction 1506 m of Major Bridge covering ROB’s over Yerragutla and Guntakal BG Line including 3 viaducts (of 13 spans x 27.6m; 3 spans x 27.5m; 17 spans x 27.5m) in EPC contract for 4 laning of Cuddappa- Kurnool section of NH-18 from existing Km 167.750 to Design Km 356.502 in the State of Andhra Pradesh.
- Construction of Major Bridge over river Pennar at ch. 175+381 in contract package for 4 laning of Cuddappah – Kurnool of NH-18 from km 167.750 to Km 356.502. Length of the bridge 650m (32 spans x 15m) + (7 spans x 26m) with open and pile foundation.
Minor Bridges
- Construction of approaches to the ROB at Km 0/2 of Kavali-Udayagiri-Seetharampuram road in Kavalitown limits open Foundations.
- Construction of High Level Bridge across river Pennar Near Jonnawada village in Nellore District well Foundations.Construction of Bridge across Kunderu drain on the road from Chinagajam to Salt Factory road in PrakasamDistrict well Foundations.
- Construction of Bridge across river Pulikalva in Km 7/8 of M.C Road to Gunapatipalem (via) Annamedu
well Foundations. - Construction of Kurnool ROB of single span of 40 meters, open foundation.
- Construction, Widening, Reconstruction and Rehabilitation of over 14 numbers of Minor Bridges; 3 PUP’s
and 1 VUP under EPC contract for Six Laning of Gurgoan – Kotputli – – Jaipur Section of NH-8 from stretches km 42.70 to Km 73.00, km 107.10 to Km 144.77 and km 181.30 to Km 219.50 in the State of Haryana and Rajasthan to be executed. - Construction and Rehabilitation of 3 numbers of Minor Bridges under Contract for Widening & improvements
to Mysore – Bantwal Road (SH-88) Package – C from Sampaji to Mani from Km 148.50 to 220.40
Kms in the State of Karnataka